This is going to be a dry post. I'm putting up a ton of pre-renovation cabin pics just for documentation. Mr. Bruce has been up there the last 6 weekends working like a fiend. He also struck a deal with a too busy contractor. It is so wild in this area presently, with people buying property as quickly as it hits the market, then fixing it to flip, or live in themselves, that it is next to impossible to find a decent contractor worth his salt. All the good contractors/carpenters are lined up with work for months to come. I'm sure there are plenty of shysters out there, because when it's popping like this, those shady types are drawn in like rats to grain. But Bruce has known this fellow for years, and the man is a local that has lived here all his life. He has a good reputation, and is therefore busier than the dickens. But, after a bit of skillful finagling and bartering on my Mister's part 🙂 , the contractor said if Bruce will have everything lined out, and every bit of the lumber, cement, screws, nails, basically every and all supplies needed (including all the new Windows, and all the new flooring) sitting at the cabin ready to go, he and his crews will pop up there between their other big jobs as time allows. Anytime there is slack on the big jobs they're working on, or if there is inclement weather that they can sneak away from their outdoor projects and come up to work on indoor things for us, they'll shoot up to the cabin and try to bang out one project at a time. That's about as good as it gets right now for folks like us that have comparatively smaller projects. When it's chaotic like it is presently, in demand contractors don't want small jobs. Especially when they have to trek clear up into the mountains to do them.

Oh, good gosh, I hope this works out!! We've been burned by carpenters before, but we've also been lucky enough to have some excellent ones do big jobs for us at our house. I just want to get the big basics done on the cabin, then Bruce and I can tackle the smaller, more manageable ones. Bruce doesn't have the time, or number of men available that are needed to get windows and doors installed, the wood flooring laid, or the walls put in. He will still be doing the majority of plumbing and electrical himself, as well as all the trim and finish work; and together we can install the wood “tongue and groove” panels on the walls, sheet rock where needed (if we decide to use sheet rock in the bedroom and bathroom), building and rocking the new hearth for the wood stove, and installing whatever we decide to use for kitchen cabinetry. I can paint, wallpaper, tile, stain, make curtains, and decorate to beat sixty without any help. But for the big, heavy duty stuff, we need a crew of men to come in and hit it hard to get it done in short order.

Once the new windows are in place, we can contact the company that will sandblast the logs on the exterior (the company we looked into uses ground walnut shells to blast, then the shell dust and log dust can be left on the ground to naturally decompose). The blasting will basically sand away the discoloration and weathering, and leave a nice even tone on the logs to then stain and seal, making the exterior look brand new, hopefully.

The odd shaped windows on the top right will be eliminated. Then, all along the top, left to right under the pitch, will be framed in and probably covered with shakes, so it will be symmetrical.

 

This bay window is being replaced with a picture window. Same width and height, but flat in the wall.

 

The circular vent to the left of the window will come out as the furnace is moving to the hallway, resulting in dreaded log patching.

 

A larger window will replace the bathroom window, shown center, which will require log cutting and patching.

 

The kitchen window, left of door, has to be raised 1 1/2 logs higher, and the porch window, far left, will be eliminated. More log cutting, and filling. Not fun.

 

 

Porch floor must be laid, and an end wall built, since there will only be stairs to the front now.

 

 

This is the enclosed portion of the front porch. The 2 windows shown will be eliminated, and a big walk-in storage closet will be built, floor to ceiling across this whole end of the porch. There isn't much room for storage in the living area of the cabin, so we want to be smart with this space and squeeze every square inch to make it useful for hanging, boxing, shelving, leaning, and stacking. The window on the floor to the left came out of our kitchen at home when we remodeled and put in the giant picture window. This will be installed to the right of the front door entering the porch. We bought a nice, solid wood door with glass upper from Craigslist, saving probably $300 vs buying a brand new one. We got bids from 3 different companies on the window package we need. Only 6 windows have to be purchased, and I was shocked at the $5,500 price tag from the first company. The second company came in at $4,200. These bids were for aluminum clad wooden windows. We got a bid for vinyl windows next, which was much more reasonable (less than a third of the first bid), albeit not quite the quality we were hoping for – but we have to remind ourselves that this is just a cabin, not a full time residence. And we need to be careful not to dump in more money than we would ever be able to recoup on the little place. Having to build the new foundation, and crane the cabin to it, put a major dent in the budget right off the bat. We have to be very careful with our spending, being mindful to get the most bang for our buck. There is a very long list of things yet to do, and after the shock of the windows bids, we will have to be extra diligent in searching out the best buys. That shouldn't be hard with the decorating/furnishings (since I'm the queen of rummage saling ;-0) but building materials are a different kettle of fish.

As for the inside…..

We do have a plan roughed out. Bruce is wrangling in the plumbing right now. We're having a heck of a time trying to find the best options for hot water. We don't particularly want to go the heater tank route because, unless you plan to keep the propane furnace at 48 degrees all winter (which would be very costly) to prevent water in the tank and pipes from freezing, you must drain and winterize the tank each autumn. That means no hot water if you hope to snowmobile in for weekends in the winter. There are many tankless, hot water on demand options available, but high altitude, extreme temps, and not being there daily, really complicate the decision. I know there must be a good option because I've seen tv shows about hunting camps in Alaska where guides bring folks to a shut down cabin, walk in, flip a few switches, and they're fully functional for a week or so. They leave after minimal winterizing, basically in suspension til next trip in, which they do often, all winter long. We've researched on the internet; I even got a year subscription to Cabin Living magazine to look into that and other things, hoping to make the most informed and correct choices. We surely don't want to dump a bunch of $$ into things, just to have them be dysfunctional and have to be replaced for even more $$. Bruce has checked with other folks in our cabin community, and it seems bottom line up there is water heater tank – bite the bullet and leave the heat running; or rough it – winterize and do without hot water in the winter months. I'm sure there has to be a better, more practical option. We'll keep after it…if nothing else, Mr. Bruce is the prize winner in persistence.

 

The blue tape lines are wall placement markers for bedroom and bathroom. Bigger bed and bath than what was there before, but still mighty tight!

 

Such a dreadful mess - makes me want to pull my hair! Doesn't bother Bruce in the least.

All I know is summer is fleeting, and boy, do we have a lot on our plate! Between work schedules, my folks moving, trying to get as much as possible done at the cabin in the short season we have to do it, and regular old house chores and maintenance, we could all stand a few more hours in the day to be sure!

Anyhoo, not whining….even if it does sound like it! All these things are very good “problems” to have! And not problems at all! We just need to stay organized, and step it up as best we can.

Meanwhile, Pinterest is my friend – it gives me so much to aspire to!

TTFN,

Teresa 🙂

 

Share

6 thoughts on “Journaling the Cabin Progress

    • @Roy Terry: Thanks for the encouragement, Roy. Finally found a contractor who committed to giving us a leg up on the project. He was to start next week. Got a text last night he was in a motorcycle accident last week and broke his foot, so now we’re on the back burner, yet again. Gosh darn it!!
      Teresa recently posted…If You Have A Silver Spoon…….My Profile

  1. Thanks for sharing your project in progress. Adding an attic storage for extra space will be a big help. Looking forward to see the pictures when it’s finished.

    • @Macs: Thanks for taking a peek! Working on electrical and plumbing right now. Trying to tie up all the loose ends before the snow flies. Majority of new windows now installed, and foam insulation blown in on underside of floor, so should be nice and toasty this winter!

Leave a Reply